Brand: Lufkin
Tape Long Leader 3/8"X100'
$115.78 · Available inventory · SKU 182-HC256N
Expected delivery: Tue, Nov 24 · Ships from New Jersey
Lufkin Tape Long Leader 3/8"X100'. Size 3/8 x 100ft. Pressure-sensitive tape for sealing, bundling, masking, marking or electrical insulation, depending on the type. Sold each. Manufacturer part number HC256N.
Specifications
| SKU | 182-HC256N |
|---|---|
| Brand | Lufkin |
| Manufacturer part number | HC256N |
| UPC | 037103296856 |
| Size | 3/8 |
| Length | 100ft |
| Shipping weight (lb) | 1.7 |
| Measurement system | Inch |
| Category | Adhesives, Sealants & Tape › Tape |
Other options
Length: 50ft, 100ft
Similar products
- Tape Long Artisan 3/8"X20' $127.78
- Tape Long Anchor 3/8"X50' $146.01
- Tape Long Artisan Tree 3/8"X20' $122.16
- Tape Engr Long Anchor 3/8"X50' $108.99
- Tape Long Challenge 3/8"X33' $255.38
- DW Tape CD 300ft Fiberglass Long $44.83